Rechtenbach

Rechtenbach

16 MW storage capacity
20 MWh storage capacity
Lahn-Dill district, Hesse
Realized
Under construction
Ready for construction

The battery storage project in Rechtenbach has an output of 16 MW with a large storage capacity of 20 MWh. It was implemented in cooperation with ABO Wind. Battery cells from LG Chem are used. The battery storage system is used to provide system services (in particular primary control power) and to generate revenue from optimization on the spot market and is connected to the EAM Netz GmbH network. The battery storage system was completed at the end of 2022 and put into operation in 2023. It was sold to VERBUND and has been operated by them ever since.