/ Projekt
Iphofen

Iphofen

20.7 MW storage capacity
24 MWh storage capacity
Kitzingen district, Bavaria
Realisiert
Im Bau
Baureife ereicht

The battery storage project in Iphofen, in the Kitzingen district, has an output of 20.7 MW and a large storage capacity of 24 MWh. Battery cells from LG Chem are used. The battery storage system is used to provide system services (in particular primary control power), as well as to generate revenue from optimization on the spot market and avoided network charges (§ 18 StromNEV) and is connected to the N-Ergie Netz GmbH network. The plant, which was completed and put into operation in 2022, was sold to VERBUND and has been operated by them ever since.