The battery storage project in Iphofen has a capacity of 20.7 MW with a gross storage capacity of 24 MWh. Battery cells from LG Chem are being used. The battery storage system will be used to provide system services (in particular primary control power), as well as to generate revenue from optimization on the spot market and from avoided network charges (Section 18 StromNEV) and is connected to the network of N-Ergie Netz GmbH. The battery storage system will be completed and commissioned in 2022 and is located in the Bavarian municipality of Iphofen in the district of Kitzingen.